Skip to content
Select language

Johann Wolfgang Goethe University Hospital Service Building 35 — Frankfurt — Germany

Products

RECYFIX POINT 30/30, Point drainage, class B 125, with foul air trap, mud bucket and KG-pipe connection DN/OD 110, DN/OD 160

Construction height 300 mm, with mesh grating MW 30/10 mm, galvanised

RECYFIX POINT 30/30, Point drainage, class A 15, with foul air trap, mud bucket and KG-pipe connection DN/OD 110, DN/OD 160

Extension frame with 2 bolt connection points

FASERFIX KS 150 up to class F 900

Type 150, with galvanised angle housing, 1,0 m

FASERFIX POINT KS 40/40, Point drainage, class E 600, complete with PVC-U socket and sealing DN/OD 160, foul air trap and Aluminum bucket

One piece with GUGI-ductile iron mesh grating MW 15/25 mm, galvanised

FASERFIX POINT KS 40/40, Point drainage, class E 600, complete with PVC-U socket and sealing DN/OD 160, foul air trap and Aluminum bucket

One piece with GUGI-Ductile iron mesh grating MW 15/25 mm, black

FASERFIX KS 150, class D 400

Longitudinal ductile iron grating SW 9 mm, black, KTL-coated, locked, 0,5 m

Sales Office

DE - Sales Office Frankfurt
Hermann Walter
Back to Case Study Object Finder

Questions?

Our experienced planning team will be happy to help you.

Get in touch
Questions?